A large pressurisation unit to fit into a small space
25th November 2021
Kent University required a pressurisation unit to maintain pressure control of their main heat network.
Aquatech Pressmain worked on this project with mechanical services’ consultant Wilson Building Consultancy, designing this large high temperature hot water pressurisation unit with our unique active buffer vessel system (ABV).
Using the ABV system we can dramatically reduce the unit’s overall footprint compared to traditional nitrogen and passive cooling vessel methods.
The three expansion spill tanks were fabricated in sections, to facilitate access into the plant area, making them easier for Amdell Building Services to install.
Are you struggling with plantroom space for your pressurisation unit?
If so please call Aquatech Pressmain now.