Commissioning / Site Visit Request

*Company name

*Company address

*Postcode:

*Site address

*Postcode:

*Telephone:

Email *

Fax:

ORDER NUMBER FOR COMMISSIONING (to be made out to Aquatronic Group Management Plc):

*EQUIPMENT:

*SERIAL NUMBER MUST BE SUPPLIED (This can be found on the front of the unit and is prefixed WN, WQ or SN):

Location of equipment (e.g. boiler room):

Site Contact:

Mobile Phone Number:

Requested date of attendance (normally allow 7 working days):
Day: Month: Year:

Details of site induction, if required (we reserve the right to make an additional charge):

Details of fault (if any):

(parts fitted/repairs carried out may be subject to additional charge)

Details of any other special requirements:

Risk Assessment / Method Statement required: YesNo

Parking on site: YesNo

Please note that the unit(s) will be commissioned to the static height of the building. Any additional pressure requirements must be advised prior to commissioning.

*PRE-COMMISSIONING CHECKS BY CUSTOMER (MUST BE FILLED IN)
In order for our service engineer to correctly commission the above equipment, please confirm the following have been completed (where applicable):

*YesNo : Electrical mains supply to unit is permanently connected (i.e. not temporary supply, via generator etc)

*YesNo : Volt free contacts to BMS connected (only if supplied)

*YesNo : Pipe work to and from the unit

*YesNo : Mains water supply is permanently connected

*YesNo : Nitrogen bottle connected (Where applicable) complete with suitable regulator

*YesNo : Unit is fitted in accordance with relevant AquaTech Pressmain installation manual

*YesNo : All permits for work arranged, if required

*YesNo : Circulating pumps/Boilers/Chillers are ready for use and available to heat/cool system when P/U switched on

*YesNo : Tank monitoring sensors are installed in tank(s) and wired back to control panel in accordance with the instructions manual provide

ALL FIELDS MARKED WITH A * MUST BE FILLED IN

Please note, Should we find that the unit(s)/boilers/chillers/circulating pumps or any of the above are not ready/unavailable/ on the agreed visit date and/or previously unadvised site inductions are required, we reserve the right to make an additional charge for unexpected down time/waiting time or an aborted visit fee.

Confirmation of site visit request:
Your Name *

FOR EACH SITE VISIT, THIS FORM WILL NEED TO BE COMPLETED IN FULL AT LEAST 7 DAYS PRIOR TO THE INTENDED VISIT DATE